requestId:68614926d76a21.36435124.
On August 14, China Guangxi E-commerce Platform issued a notice on the general contracting bidding notice for the design and construction of the China Guangxi Hubei Xiangzhou Longwang Phase I (Fuzhang) Agricultural Optical Internal Supplementary Photovoltaic Power Generation Project, and China Sugar daddyGuangxi LakeSugar daddyThe general contract bidding notice for the design and construction of the agricultural and optical interconnection photovoltaic power generation project in Beixiangzhou, North Xiangzhou, issuance of the bidding project location, Hubei Province, Xiangfan City, and Xiangyang District, three areas. The daily construction date will be September 1, 2020. The jade department will be completed and powered online before December 30 this year.
China Guang Nuclear Hubei Xiangzhou Longwang Phase I (Fuzhang) Agricultural Optical Internal Supplementary Photovoltaic Electric Power Generation Project Design and Construction Notice
(Tender No.: CGN-202008140007)
Tender Project Location Area: Xiangfan City, Hubei Province, Xiangyang District
1. Tender ConditionsSugar daddy
In this project, Guangnuo Hubei XiangSugar babyFirst Phase I (Fuzhang) Agricultural and Optical Replenishment Photovoltaic Power GenerationSugarSugarSugarSugarSugar daddy project design and construction general contracting (tender project number: CGN-202008140007), has been approved by the project review/approval/preparation agency. The project funds are from the company and have been implemented. The bidder is China Guang Nuclear Solar Energy Supply Co., Ltd. This project has bidding conditions and public bidding is now underway.
2. Project overview, bidding scope and planning period
Project size:
The China Guang Nuclear Xiangzhou Longwang Phase I (Fuzhan) Agricultural Optical Internal Replenishment Photovoltaic Power Generation Project is located in Fuzhuang, Sijia, Songshupo and other villages in Longwang Town, Xiangzhou District, Xiangyang City. It is surrounded by G70 expressways, and X00Manila escort8 County Road and 026 Road pass through the site area. There are already many villages and villages in the scope of the road, and the road conditions are not href=”https://philippines-sugar.net/”>Pinay escort is very convenient.
The capacity of this project is 100MWp, and a 110kV pressure upgrade station is set up, and a 110kV Konka power station is connected to a 110kV line.
Tender content and scope:
The scope of this project is the photovoltaic area of Xiangzhou Longwang Phase I (Fuzang) Agricultural Optical Internal Replenishment Photovoltaic Power Generation ProjectSugar daddyThe procurement of all construction tasks and all required equipment and materials: preliminary design of photovoltaic field, construction drawing design (including completion drawing), data procurement, building installation and commissioning, photovoltaic field water environmental greening, important tasks include but are not limited to the following content: preliminary design documents, construction drawing design, completion drawing, equipment and data procurement Supply, equipment and data unloading and storage, photovoltaic area (including 35kV integrated circuit) test inspection, civil engineering installation, construction, trial and inspection, full capacity of the entire site and stable network 240 hours of operation, defect elimination, functional test, inspection and acceptance of the functional guarantee of the entire system, technical and after-sales service, and complete completion of all tasks (economy, water protection and maintenance) ), and also includes tasks such as supply of spare parts, special items, consumables and related technical data, construction and acceptance of field routes, column procurement and construction, photovoltaic field and collective line land acquisition coordination and all coordination within the construction scope. The bidder shall be responsible for all tasks within the above tasks.
Specific bidding For details, please refer to the bidding technical documents.
Planning construction period:
Total construction period: 120 days.
Planning construction daily date September 1, 2020, the specific daily date of construction is based on the starting order issued by supervision.
The Jade Department will be completed before December 30, 2020, and the final project will be merged into the Internet. href=”https://philippines-sugar.net/”>Escort manila will not be changed.
III. Investor qualification request
Basic qualifications: The investor must be a business/public with independent legal person registration within the People’s Republic of China (excluding Hong Kong and Macao platforms) and has independent legal person qualifications. escort; the bidder must have a safe production license (except for design units) and is within the useful period.
Quality request:
For this bidder must have one of the following qualifications:
(1) Level 3 and above for general contracting for power engineering construction;
(2) Power industry (New Power DevelopmentElectrical) Level B and above design qualifications.
Financial request: /
Same type of engineering experience (professional results) request:
(1) Design request: /
(2) Construction request: /
Credit request: /
Security request: /
Security request: (1) Project manager: Have a registered first-class construction engineer registration certificate and the registered unit must have a different name from the bidder, and have the “Certificate of Passing the Safety Production Inspection” within a useful period.
(2) Ping An employee: has a useful period of built-in “Ping An Production Inspection and Qualification Certificate”.
Other requests
(1) This project does not accept joint bids.
(2) The bidder must pass ISO9000, ISO14000, and ISO18000 issues. ”Class or plan a quality, environment, and safety system certification.
IV. Acquisition of bid documents
1. Acquisition time: The start time of obtaining bid documents: August 14, 2020 Escort17:30; Deadline: August 24, 2020 Pinay escort30
2. Acquisition method
(1) The bidder should issue the bid documentsPinay escort during the sales period, you need to fill in the authorized bid contact information on the China National Network Core E-commerce Platform (https://one sentence introduction: Marriage first and fall in love, warm and cool little text/ecp.cgnpc.com.cn). When registering, you must fill in the authorized bid contact information.
(2) If the bidder has been registered as a member of the China Guangxi Nuclear E-commerce Platform, you can log in directly to the Escort manila name. Otherwise, you must first register as a member of the platform before you can register. Please refer to the China Guangxi Nuclear E-commerce Platform for details on the registration of a member. If the information of the Business License changes when the bidder registers, please log in to the Sugar daddy‘s nuclear e-commerce platform to change the new information about the member registration information. The applicant failed to change the new data registration letter in time because he was unable to change the new data registration letter in timeIf the interest affects the bidder’s bid, the bidder shall bear the responsibility on his own.
(3) After the bidder wins the profit and registers, the bidder will authorize the bidder to download the electronic version of the bid documents online.
(4) The bidder must complete the relevant tasks of bid registration and downloading bid documents within the bidding document acquisition time, and the system will automatically close during the period. Tenders who fail to register and download bid documents in accordance with the above requests shall not participate in the bid. Tenders have the right to refuse their bid documents. If they have collected it, they shall be processed as Sugar daddy invalid bid.
5. Deadline for delivery of bid documents: 09:00 on September 4, 2020
Transfer method: This project adopts electronic bidding, and there is no need to submit paper bidding documents. For details on the submission method, please see the bidding document Chapter 2 “Purchaser must know”.
6. Opening time and method
Opening time: the deadline for submitting the same bid documents.
Tag opening method: Open tag online.
7. Other notices and notification content
Quality review method
This project adopts the post-qualification review method.
Preface to the issuance of notices
This bidding information is simultaneously published in the book on the “China Core E-commerce Platform” (https://ecp.cgnpc.com.cn) and the “Chi TC:
發佈留言